MCSC completed execution of AGEP Phase 4 Rental Compressor Stations Project

Back

As part of Tatweer Petroleum’s field development plan for the Awali Oil Field in Bahrain, a new drilling programme with approximately 800 new wells was introduced. To process the increased production, new light oil facilities like 15 new well manifolds were installed. Each well manifold will be capable of processing an oil flow rate of 300 bbl/day, a produced water flow rate of 20,000bbl/day and an associated gas flow rate of 20 MMSCFD. MCSC was awarded with the EPC contract to design, procure, fabricate, install, test and commission the 15 new well manifold facilities.

MCSC successfully completed AGEP Phase 4 Rental Compressor Station Project on schedule maintaining a high level of safety and quality performance. To mark this occasion the Project Management organized a special function at the project site at Jabel Oil Field on 19-May-2015. Project teams of Enerlex and MCSC and the entire workforce were present during the occasion. During the function, best performed employees were recognized with awards and certificates. Enerflex appreciated MCSC for its very professional project management, safe working approach and maintaining good workmanship throughout the project.

This project, which is a part of Tatweer Petroleum’s AGEP Phase 4 works for enhancing the production from the Bahrain Field, was to construct 3 Compressor Stations at different locations of Bahrain Oil Field.

Project Scope & Highlights:

MCSC’s Scope includes Civil Works, Erection, Assembly and Alignment of compressors, coolers and other equipment, Structural Works, Piping Works, Electrical and Instrumentation Works including procurement, Pre Commissioning and Commissioning Assistance.

  • Project Duration: November 2014 to May 2015
  • Total Man Hours: 390,000 Man Hours without LTI, 350 Men During the Peak
  • Heavy Concrete Foundations: 2,400 Cu.M.
  • Piping: 29,000 Inch Dia.
  • Heavy Equipment Erection: 24 Compressors, 24 Coolers and 27 Other equipment.
  • Structural Works: 300 Tonnes
  • Electrical and Instrumentation Works : Procurement of E&I Materials, Cable Laying, Instrument Installation, Glanding and Termination, Earth Drilling Works, Calibration of Instruments, Loop Checking Etc.